info@vizkorterv.hu +36 20 251-1828

M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities

February 2018 - December 2019

On behalf of the NIF National Infrastructure Development Ltd., the STR-B M85 Consortium was building the section between the "M85 expressway Csorna II. - Fertőd-Endrédmajor intersection" (31+550 – 51+600 km stations). On behalf of the Consortium, the construction plan for water utilities were prepared by VÍZKÖRTERV Kft. as a subcontractor.

As a BIM consultant, VÍZKÖRTERV Kft. was responsible for the creation of an always up-to-date integrated utility network plan where simulations, clash detections were executed along the whole lifecycle of the project.

M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities 1
M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities 2
M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities 3
M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities 4
M85 expressway Csorna II. – Fertőd-Endrédmajor section detailed design for water utilities 5

More references

© 1997-2025 VÍZKÖRTERV Ltd. - All rights reserved.