info@vizkorterv.hu +36 20 251-1828

M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities

February 2021 - December 2022

On behalf of the NIF National Infrastructure Development Ltd., the S+D M6 Consortium was building the section between the "M6 expressway Bóly - Ivándárda (border crossing)" (192+200 - 212+130 km stations). On behalf of the Consortium, the construction plan for water utilities were prepared by VÍZKÖRTERV Kft. as a subcontractor.

As a BIM consultant, VÍZKÖRTERV Kft. was responsible for the creation of an always up-to-date integrated utility network plan where simulations, clash detections were executed along the whole lifecycle of the project.

Major facilities:
   • correction of drinking water and wastewater network along the motorway,
   • water utility supply for complex rest areas near Nagynyárád and near Ivándárda
   • water utility supply for maintenance plant near Babarc with pumping station

M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities 1
M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities 2
M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities 3
M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities 4
M6 expressway Bóly – Ivándárda (border crossing) section detailed design for water utilities 5

More references

© 1997-2025 VÍZKÖRTERV Ltd. - All rights reserved.